January 1, 2019

US 68 / KY 80 Environmental Assessment

Location:
Marshall & Trigg Counties, Kentucky
Client:
Kentucky Transportation Cabinet
Service Line:
Environmental Services

The planned improvements to US 68/KY 80 spanned approximately 17 miles from KY 94 to the Cadiz Bypass. This involved crossing a number of environmentally-sensitive areas including Kentucky Lake and Lake Barkley, as well as through Kenlake State Resort Park and Land Between the Lakes.

As part of the Environmental Assessment, Lochmueller served as the subconsultant responsible for completing aquatic and terrestrial baseline studies and the hazardous materials baseline study. Subsequently, Lochmueller conducted a cumulative impact assessment on threatened and endangered species as well as other wildlife within the Land Between the Lakes portion of the project area to address revised alignments through this section. Mitigation was proposed to lessen any potential impacts to listed species in the areas of potential habitat. Control of invasive species was also addressed.

Since the completion of this study, Lochmueller has also completed permitting and mitigation efforts for Land Between the Lakes.

No items found.
Supply Chain & Logistics

Keefe Group Network Optimization

READ MORE
Supply Chain & Logistics

On-Site Fuel Transportation Optimization

READ MORE
Supply Chain & Logistics

Anheuser-Bush Logistics Support

READ MORE